Your progress
Ticks are kept only in this browser: clearing your browsing data or changing device loses them. · ·

Numeracy Higher June 2018 Unit 1 Q1

WJECHigherCurrent spec10 marks2D Area & PerimeterFractionsPrisms

1.

(a) In this part of the question, you will be assessed on the quality of your organisation, communication and accuracy in writing.

The concrete base of Miss Morgan’s new bungalow is shown below.

L-shaped plan of the base: top 20 m, right side 15 m, left side 4 m, step 5 m, all corners right angles

Diagram not drawn to scale

The concrete base of Miss Morgan’s bungalow is 0·2 m thick.

The L-shaped concrete base drawn in 3D, 0.2 m thick

Diagram not drawn to scale

Calculate the volume of the concrete base.
You must show all your working. [4 + 2 OCW]

(b)

Mr Graham is building a garage.

A concrete mixer lorry holds a maximum load of 6 m3 of concrete.
There is a fixed standard delivery charge of £35 per load.
The concrete costs £45 per m3.

Mr Graham orders \(\dfrac{2}{3}\) of the maximum load of concrete for the base of his garage floor.

What is the total cost of Mr Graham’s order? [4]

Total cost is £ ……………………