D2 June 2014 Q5
5.

Figure 1 shows a capacitated, directed network. The number on each arc represents the capacity of that arc. The numbers in circles represent an initial flow.
| Scheme | Marks |
|---|---|
| Initial flow = 62 | B1 |
| (1) |
Notes
a1B1: CAO
| Scheme | Marks |
|---|---|
![]() | M1 A1 |
| (2) |
Notes
b1M1: Two numbers on each arc and at least two arcs or four numbers correct (so correct numbers with the correct arrows).
b1A1: CAO do give bod since they might well cross these number out.
| Scheme | Marks | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
E.g.
| M1 A1 A1 A1 | ||||||||||||||||
| (4) |
Notes
c1M1: One valid flow augmenting route found and a value stated.
c1A1: Flow increased by at least 2.
c2A1: A second correct flow route and value correct.
c3A1: CSO Flow increased by 8 and no more.
| Scheme | Marks |
|---|---|
![]() | M1 A1 |
| (2) |
Notes
d1M1: Consistent flow pattern \(\geqslant\) 64 (check each node). One number only per arc. No unnumbered arcs.
d1A1: CAO, showing flow of 70, must follow from their routes.
| Scheme | Marks |
|---|---|
| The cut through SA, AB, AE, DE, ET and FT has value 70 | DB1 |
| Value of the flow is 70 so by max flow – min cut theorem flow is maximal | DB1 |
| (2) | |
| 11 marks |
Notes
e1DB1: Must have attempted (d) - at least one number on all but one arc, and either drawn or stated a cut. Cut may be drawn on any diagram.
e2DB1: CSO – (d) fully correct (showing a correct flow of 70) and a correct cut. Must refer to max flow-min cut theorem – all four words.