D1 June 2012 Q7
7.

A company is going to hire out two types of car, standard and luxury.
Let \(x\) be the number of standard cars it should buy.
Let \(y\) be the number of luxury cars it should buy.
Figure 6 shows three constraints, other than \(x,\ y \geqslant 0\)
Two of these are \(x \geqslant 20\) and \(y \geqslant 8\)
The company decides that at least \(\dfrac{1}{6}\) of the cars must be luxury cars.
Each time the cars are hired they need to be prepared. It takes 5 hours to prepare a standard car and it takes 6 hours to prepare a luxury car. There are 300 hours available each week to prepare the cars.
The company expects to make £80 profit per week on each car.
It therefore wishes to maximise \(P = 80x + 80y\), where \(P\) is the profit per week.
You must clearly draw and label your objective line and the vertex \(V\). (3)
| Scheme | Marks |
|---|---|
| \(y \leqslant x\) | B1 |
| (1) |
Notes
a1B1 CAO
| Scheme | Marks |
|---|---|
| \(y \geqslant \dfrac{1}{6}(x + y)\) \(6y \geqslant x + y\) \(5y \geqslant x\) | B2,1,0 |
| (2) |
Notes
b1B1 Either of my first two lines. Must have three terms, two in \(y\) and one in \(x\).
b2B1 CSO. (Answer given) must have \(\geqslant\) throughout.
| Scheme | Marks |
|---|---|
| \(5x + 6y \leqslant 300\) | B1 |
| (1) |
Notes
c1B1 CAO
| Scheme | Marks |
|---|---|
![]() | |
| Two lines and shading correctly added | B1 B1 |
| (2) |
Notes
In (d) If lines do not meet both axis then extend as necessary, but must extend beyond the feasible region. Use the line drawing tool to check.
d1B1 \(5y = x\) drawn correctly, passes within a small square of (0,0) and (50, 10). Ignore shading.
d2B1 \(5x + 6y = 300\) drawn correctly, passes within a small square of (0, 50), (30, 25) and (60, 0) Ignore shading.
| Scheme | Marks |
|---|---|
![]() | |
| R correctly labelled | B1 |
| (1) |
Notes
e1B1 CAO – but must have scored both marks in (d)
| Scheme | Marks |
|---|---|
![]() | |
| Objective line correctly drawn and labelled | M1 A1 |
| Optimal vertex labelled | A1 |
| (3) |
Notes
f1M1 Drawing objective line with correct gradient, use line drawing tool to check if necessary. You can give BOD here if it is close. If their line is shorter than the length equivalent to that of line (0, 5) to (5, 0), please send to review.
f1A1 Correct objective line drawn (so no BOD) and their correct V labelled, or clearly indicated, or coordinates written to 1 dp.
f2A1 CSO, R correct, my V labelled or clearly indicated, or coordinates written to 1dp so awrt (48.4, 9.7).
(Corrected from the printed mark scheme: the coordinates of V are printed the wrong way round as (9.7, 48.4).)
| Scheme | Marks |
|---|---|
| Buy 48 standard and 10 luxury cars, Expected profit £4640 per week | 1B1 2B1, 3B1 |
| (3) | |
| (13 marks) |
Notes
g1B1 Finding vertex, in my R, with integer coordinates. Must be within 2 small squares of their V and must be maximising, so accept only; (48, 10), (47, 10), (46, 11), (27, 27), (28, 26).
g2B1 CAO (48, 10)
g3B1 CAO 4640