4MA0 Higher June 2014 Paper 4 Q10
10 The table shows information about the times, in minutes, taken by 50 people to get to work.
| Time taken (\(t\) minutes) | Frequency |
|---|---|
| \(0 \lt t \leqslant 10\) | 6 |
| \(10 \lt t \leqslant 20\) | 10 |
| \(20 \lt t \leqslant 30\) | 19 |
| \(30 \lt t \leqslant 40\) | 15 |
Work out an estimate for the mean time taken to get to work.
(4)
| Scheme | Marks |
|---|---|
| (6×5) + (10×15) + (19×25) + (15×35) or 30 + 150 + 475 + 525 or 1180 | M2 |
| “1180” ÷ 50 or \(\dfrac{\text{“}30\text{”} + \text{“}150\text{”} + \text{“}475\text{”} + \text{“}525\text{”}}{6 + 10 + 19 + 15}\) | M1 |
| 23.6 | A1 |
| (4 marks) |
Notes
M2: freq × all correct midpoint values stated (or evaluated) with intention to add (condone any one error)
If not M2 then award M1 for all products \(t \times f\) (and \(t\) is consistently within the interval, including end values) and intention to add (condone any one error)
M1: (dep on at least M1)
A1: Accept 24 with working (24 without working gains M0A0)